p r o j e c t s - i n d u s t r i a l : _SMUD Substation A SMUD Substation
A Improvements Project: SMUD
Substation A Improvements, 6th & H Street,
Downtown Sacramento Area: Two story
Brick Structure, with basement Site Features:
This 1895 brick industrial structure was
seismically upgraded to be able to maintain power
for the entire downtown Sacramento during a major
emergency. The walls were reinforced with a method
utilized widely in Europe but never in the United
States, called Internally Reinforced Masonry
system. The Historic exterior and interior
character were maintained and restored. Interior
spaces were upgraded within the historic context to
meet current accessible requirements. Client:
Sacramento Metropolitan Utility District Reference: Ron
Migliori Responsibilities:
Full Architectural Services Design Build home / firm profile / biographies / projects / awards & achievements / employment / contact us
tel
_916
. 453 . 1505 _
-
_
fax
916
. 453 . 0843 _
-
_
4532
freeport boulevard, sacramento, ca
_
95822 |